A city block with a rooftop garden on a three-story building, people gathering outside, colorful mural on the side, and surrounding trees and urban apartments in the background. Children play soccer and others gather in a sunny, tree-filled urban park beside a beige building with colorful murals. Benches, flowers, and trees surround the lively playground scene. A lively courtyard with adults and children walking, talking, and playing among trees and flowerbeds beside a modern brick building on a sunny day. A modern brick building with large windows and a covered outdoor patio where people are sitting and talking. Trees and other buildings surround the scene under a clear blue sky. Aerial view of a yellow school building with rooftop garden, colorful mural, and outdoor terrace, surrounded by trees, people, and city buildings in the background. Architectural cross-section of a multi-story building showing labeled areas for advocacy, environmental education, connection, and arts education, with annotations for building additions, stormwater planters, and geothermal systems.

Completion

Ongoing

Location

South Bronx, NYC

Client

South Bronx Unite; Mott Haven-Port Morris Community Land Stewards; Alembic Community Development

The HEArts Center continues a legacy of community-driven advocacy at the Historic Lincoln Recovery Center, transforming the 22,750-sf WPA-era civic building into a vibrant community hub for Mott Haven. Led by South Bronx Unite and Alembic Community Development, the project adaptively reuses the long-vacant, National Register-listed structure to support a range of school-age and adult programming, including performance, education, advocacy, and community gathering spaces. A 2,300-sf addition complements the historic building while providing contemporary space to meet the evolving needs of its community-based tenants.

The comprehensive renovation preserves the building’s historic character while introducing modern systems and amenities, including energy-efficient windows, an all-electric HVAC system, elevator access to all floors, including the cellar, restored skylights, and a new green roof. Targeting LEED Gold certification, the project aligns with the high sustainability goals established for city-owned sites. New and restored exterior terraces across multiple floors extend the Center’s programming outdoors, creating opportunities for gathering and activity while strengthening visual connections to the adjacent Willis Playground and Alexander Alley Park.

COLLABORATORS
Design Architect: Bagchee Architects; MEP Engineer: EP Engineering; Civil Engineer: Hartland Engineering; Structural Engineer: TYLin Silman; Acoustics/Theatre Consultant: Charcoal Blue; Lighting Design: Kugler Ning; Geotechnical Engineering: GTA; Construction Manager: EW Howell

Renderings: Javier Galindo